HOME

 

 

RESIDENTIAL PROJECTS

 

  

COMMERCIAL PROJECTS

 

Compass   Montessori  Secondary School

Faith Lutheran Church Addition & Remodel

Ewers Architecture Office

Telluride Mountain School

Santa Ana Office Building

Myers Bradley Devitt & Arp Law Office

Education and Event Center

Lowell Whiteman School Master Plan

Lowell Whiteman School Boy's Dorm

Historic Downtown Golden Facade  Transformation

Sustainable Renovation of Historic Office

Universal Mind Office

 

P

PRO-BONO PROJECTS

 

    

       

ABOUT US

 

  

CONTACT & DIRECTIONS

 

   

 

LINKS & MORE

 

 

 

 

 

 

FAITH LUTHERAN CHURCH ADDITION AND REMODEL

This project was designed to provide Faith Lutheran Church with new entrances, an expanded office area and a larger narthex. Four previous additions to the church had also left a complex hallway system that needed straightening and consolidating.

 

The exhilarating narthex spaces now mark the entrances from the exterior, as well as provide vertical relief from the otherwise low interior ceilings.  The narthex is now generously sized, providing room to circulate and mingle on Sunday mornings.

 

The main organizing element for the hallway system is a diagonal line drawn between the center of the fellowship hall (the original sanctuary) and the center of the current worship center.  This diagonal wall not only simplifies the circulation patterns, but also adds excitement to the design while having deep meaning in linking the centers of these two important spaces.

 

This design has garnered praise from the entire congregation and staff for its simplicity and elegant solution to all the design requirements.

Area of New Construction:

2,500 square feet

Remodel Area:

3,000 square feet

Construction Cost:

$375,000

Cost per Square Foot:

$90/sf for new construction

$50/sf for remodel area

Date Completed:

September 1998

Location:

17701 West Sixteenth Avenue

Golden, Colorado

Engineers:

structural: KL&A of Colorado

mechanical: BCER Engineers

electrical: Paez Engineering

Contractor:

MW Golden Constructors

 

 

“I am amazed at the feeling of quality in our new and newly remodeled space because we had a bare bones budget, yet it is a place where I just enjoy being there.”

Pastor Bruce Hermann

 


 1 4 2 0   W a s h i n g t o n   A v e n u e     G o l d e n     C o l o r a d o     8 0 4 0 1

voice 303.271.0977      email  peter@ewersarchitecture.com      sitemap